slot ewallet slot ewallet slot ewallet slot ewallet slot ewallet online gambling singapore online gambling singapore online slot malaysia online slot malaysia mega888 malaysia slot gacor live casino malaysia online betting malaysia viagra malaysia viagra malaysia viagra malaysia Surveying and checking gas bubble which appears at the flange (spool segment) nearby the STV Platform of the 16” STV-RD pipeline route - GreenStar Technical Services JSC

Surveying and checking gas bubble which appears at the flange (spool segment) nearby the STV Platform of the 16” STV-RD pipeline route

The 16” Su Tu Vang – Rang Dong (ANSI 60#) underground gas pipeline was operated in 2009 in order to collect and transport associated gas from the Cuu Long basin. The associated gas was later joined to the Rang Dong – Bach Ho pipeline route through PLEM at the Rang Dong field. This 43.3 km pipeline is designed to lie on seabed surface with a depth of about 54m at the Su Tu Vang CPP platform at the Cuu Long field and 50m at the WHP – NE platform (operated by JVPC) at the Rang Dong field.

Sơ đồ vị trí tuyến ống 16” STV-RD